Powerhead in Action

Below is a Step-by-Step account of one of our BRAND NEW Powerheads in action at a job site in Broadbeach Waters, QLD July 2008.

1
An auger had to be used to pre-drill holes, as the ground contained several layers of different types of soil and the founding layer had to be reached before piles could be installed.

2
Positioning the auger

3
Pre-drilling

4
Reaching depth

5
Changing the drive tool over for pile installation

6
A smaller Excavator was used, with a pile grab tool to place the piles in the pre-drilled holes.

7
Positioning of pile

8
Excavator and Powerhead finding position over the pile

9
Position found

 

10
Installing the pile

 

 

Available *NOW* Powerheads especially designed and built to suit your unique application.

Ask us TODAY about how we can satisfy your speciality requirements on (07) 5593 7755 or send an email enquiry.

Russell Heale Screw Piling
Ph: +61 7 5593 7755
QBCC No: 19670 - NSW BSA No: 34715C
Tell a FriendPrintBookmark Site