Screwpiling for Pools
Steel screw piling is necessary for building foundations
where the ground is not compacted, or strong enough or of variable
capacity to carry the structure, for example in sand, mud or reclaimed
land.
Don't let this happen to your
pool!!!

Pool installed on Nerang River waterfront without
a screw pile support system. The pool has sunk by approx 3 inches
due to uncompacted ground below.
Give us call in the office if you would like to
discuss your pool installation job, on:
|
(07) 5593 7755
|
Back to top
|
Our principal Operator for steel screw pile
pool installations, Grant Massey, has been a highly
experienced Excavator Operator for over 22 years in the housing,
pool building and construction industry, being licensed in
both NSW and QLD.
He brings to the industry a unique service, by doing the excavation
and screw pile installation with the one machine, saving
additional delivery and standby costs.
Pool installation, Mermaid Beach (February 2008)
As well as offering an all in one process, he also has a Hydraulic
Hammer to suit, a generator welder which is permanently mounted
on the truck as well as carrying additional screw pile
extensions.
Grant Massey in conjunction with Russell
Heale have completed numerous steel screw piling
jobs using limited access machines as
well as barges to deliver equipment.
|