|
Limited Access & Barges
More often than not, when installing screw piles for eg. a
pool, on an exising property, the access to backyards is extremely
limited in suburban locations (sometimes less than 2m access on
either side of the house).
Even the smallest Excavators may be too large to fit, hence alternative
solutions have to be found.
This could involve attaining access via neighbouring backyards,
parks or empty lots adjoining to property, or even along beach
front at low tide (permission dependent).
However when limited access machines and alternatives are
even too limited to gain access to a specific job site - especially
on waterfront/canal properties, the use of barges becomes
invaluable.
With the ability to transport large machinery as well as other
heavy equipment and piles, barges
have become a paramount part of the access and delivery process,
for many jobs we've had on the waterfront.
Our subcontractor, Grant
Massey in conjunction with Russell Heale have completed
numerous steel screw piling jobs using limited access
machines as well as barges to deliver equipment.
By performing an on-site inspection prior to quotation
& installation, we can assess the best possible way to deliver
equipment, with the least amount of disturbance.
Whatever the job, we try to come up with the best solution regarding
access capabilites.
Call us today, with concerns about limited access to your property
on:
|
(07) 5593 7755
|
Back to top
|