Powerhead in Action

Below is a Step-by-Step account of one of our BRAND NEW Powerheads in action at a job site in Broadbeach Waters, QLD – July 2008.

Picture 1.

Powrheads

An auger had to be used to pre-drill holes, as the ground contained several layers of different types of soil and the founding layer had to be reached before piles could be installed.

Picture 2.

Powerheads

Positioning the auger

Picture 3.

Powerheads

Pre-drilling

Picture 4.

Powerheads

Reaching depth

Picture 5.

Powerheads

Changing the drive tool over for pile installation

Picture 6.

Powerheads

A smaller Excavator was used, with a pile grab tool to place the piles in the pre-drilled holes.

Picture 7.

Powerheads

Positioning of pile

Picture 8.

powerheads

Excavator and Powerhead finding position over the pile

Picture 9.

Powerheads

Position found

Picture 10.

Powerheads

Installing the pile

 

Available *NOW* – Powerheads especially designed
and built to suit your unique application.

Ask us TODAY about how we can satisfy your speciality requirements on:

(07) 5593 7755

Powerheads and Torqatrons